In June 2016, DP World was awarded a 50 year Concession to build and operate the first deep water port in Ecuador. The investment has been divided into two phases and its first phase began with construction in July 2017 and is scheduled to end in 2019.

ico15

Terminal

Phase 1

  • 480 meter berth
  • 750,000 TEU anual capacity
  • 4 Quay Cranes
  • 15 RTG
20km-200x200

Road

A 20 km road connecting the terminal to the main highway network, ensuring a quick, orderly and safe access to the port.

16m

Access Channel

A new and more secure access channel to the Guayas River with a 16,5 meters depth and a length of 21 nautical miles.

Logistics Zone

Logistics Zone

Direct connectivity with Posorja deep-water port. 100 HA of land available.

Dragado

Inicio de actividades de Dragado en el puerto: